Experience of NKC – Thai (Automobile)
COMPANY | LOCATION | SHOP & LINE | SPECIFICATION | YEAR |
TOYOTA MOTOR THAILAND CO., LTD. | BANPHO | BODY | EMS CARRIER MODIFY
FOR NEW MODEL |
2024 |
TOYOTA MOTOR THAILAND CO., LTD. | SAMRONG | ASSEMBLY | ENGINE LINE
OHC EXTENSION |
2024 |
MITSUBISHI MOTORS (THAILAND) CO., LTD. | BANGKOK | PAINT | PBS NEW STORAGE
SYSTEM MODIFICATION |
2023 |
TOYOTA MOTOR THAILAND CO., LTD. | SAMRONG | ASSEMBLY | ASSY CV MODIFY
FOR NEW MODEL |
2023 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | RENEW DRIVE SHAFT
AND T UP OF LIFTER |
2023 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | ASSEMBLY/PAINT | SAMRONG PLANT
CV INSPECTION |
2023 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | ASSEMBLY/PAINT | GATEWAY PLANT
CV INSPECTION |
2023 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
BODY | SIDE PANEL OH FCS
LAYOUT CHANGE |
2023 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | PAINT CV CAPACITY UP | 2022 |
MITSUBISHI MOTORS (THAILAND) CO., LTD. | BANGKOK | ASSEMBLY | DOOR LINE OHC
CHAIN RENEWAL |
2022 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2022 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | OHC CHAIN RENEWAL | 2022 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | PAINT BOOTH CV
RAIL RENEWAL |
2021 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
BODY | UPGRADE SYSTEM
WBS TO WINDOWS 10 |
2021 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV LAYOUT
WCHANGE |
2020 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | DAC FLOOR CV
CHAIN RENEWAL |
2020 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | ASSEMBLY | ASSY CV MODIFY
FOR NEW MODEL |
2019 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | DAC FLOOR CV
CHAIN RENEWAL |
2019 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2019 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | DAC FLOOR CV
MODIFY FOR NEW MODEL |
2019 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
BODY | FCS LAYOUT
CHANGE |
2019 |
SUZUKI MOTOR (THAILAND) CO., LTD. | BANGKOK | PAINT | OHC CHAIN RENEWAL | 2018 |
HONDA VIETNAM CO., LTD. | VINH PHUC | ASSEMBLY | NEW ASSEMBLY
LINE No.6 |
2018 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
CAPACITY UP |
2018 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2018 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
CAPACITY UP |
2018 |
SUZUKI MOTOR (THAILAND) CO., LTD. | BANGKOK | PAINT | OHC A-3
CHAIN RENEWAL |
2017 |
THAI HONDA MANUFACTURING CO., LTD. | BANGKOK | ASSEMBLY | PARTS LINE
MODIFICATION |
2017 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
BODY | FCS LAYOUT CHANGE | 2017 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | EXTEND ED OVEN CV | 2017 |
TOYOTA AUTO WORKS CO., LTD. | SAMUT PRAKAN | ED PAINT | CARRIER MODIFY
FOR NEW MODEL |
2017 |
TOYOTA AUTO WORKS CO., LTD. | SAMUT PRAKAN | ED PAINT | CARRIER MODIFY
FOR NEW MODEL |
2017 |
THAI HONDA MANUFACTURING CO., LTD. | BANGKOK | WBS | OHC AM2 CHAIN
RENEWAL |
2017 |
TOYOTA MOTOR THAILAND CO., LTD. | GATEWAY | ASSEMBLY | TF DOLLY CASTER
RENEWAL |
2016 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | CV CHAIN RENEWAL | 2016 |
TOYOTA MOTOR THAILAND CO., LTD. | GATEWAY | ASSEMBLY | MODIFY F3 DOLLY ,
TF DOLLY JIG |
2016 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2015 |
HINO MOTORS MANUFACTURING (THAILAND) LIMITED | SAMUT PRAKAN | PAINT | OH-MOTRAIN
RAIL RENEWAL |
2015 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | CV CHAIN RENEWAL | 2015 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
BODY | FCS LAYOUT CHANGE | 2014 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2014 |
TOYOTA MOTOR THAILAND CO., LTD. | BANPHO | ASSEMBLY | INSPECTION SLAT
CHAIN RENEWAL |
2014 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
BODY | NEW SPC OHC LINE | 2014 |
TOYOTA MOTOR THAILAND CO., LTD. | SAMRONG | BODY | OH-MOTRAIN
LAYOUT CHANGE |
2014 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | ADDITIONAL
DRIVE UNIT |
2014 |
TOYOTA MOTOR THAILAND CO., LTD. | SAMRONG | ASSEMBLY | DOLLY RAIL
RENEWAL |
2014 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | CV CHAIN RENEWAL | 2014 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2014 |
TOYOTA AUTO WORKS CO., LTD. | SAMUT PRAKAN | PAINT | CARRIER MODIFY
FOR NEW MODEL |
2014 |
ISUZU MOTOR CO., (THAILAND) LTD. | SAMUT PRAKAN | PAINT | PLC RENEWAL | 2014 |
HONDA AUTOMOBILE THAILAND CO., LTD. | PHRA NAKHON
SI AYUTTHAYA |
WELDING | NEW WELDING
SHOP CV |
2014 |
TOYOTA MOTOR THAILAND CO., LTD. | BANPHO | ASSEMBLY | CV MODIFY
FOR NEW MODEL |
2014 |
TOYOTA MOTOR THAILAND CO., LTD. | GATEWAY | ASSEMBLY | NEW ENGINE
OH-MOTRAIN LINE |
2014 |
NISSAN MOTOR (THAILAND) CO., LTD. | SAMUT PRAKAN | PAINT | PAINT CV
LAYOUT CHANGE |
2014 |
TOYOTA MOTOR THAILAND CO., LTD. | BANPHO | BODY | NEW DECK
TRAVERSER LINE |
2014 |
NISSAN MOTOR (THAILAND) CO.,LTD | BANGNA | PAINT SHOP
(NO 2LINE) |
POWER & FREE C/V
IVA-FRICTION C/V
|
2014 |
MITSUBISHI MOTORS (THAILAND) CO.,LTD | LAEMCHABANG | PBS | AUTOMATED STORAGE/RETRIEVAL SYSTEM | 2013 |
TOYOTA MOTOR THAILAND CO.,LTD | SAMRONG | ASS’Y SHOP
(GATEWAY NO2 PLANT) |
FLOOR C/V
SLAT-FRICTION C/V
|
2013 |
SUZUKI MOTOR (THAILAND) CO.,LTD | RAYONG | PAINT SHOP
(BUMPER) |
POWER & FREE C/V
IVA-FRICTION C/V
|
2013 |
HONDA VIETNAM CO.,LTD.
|
VIETNAM | ASS’Y SHOP
(NO5 LINE) |
OH C/V
BELT C/V FRICTION C/V SLAT C/V |
2013 |
ISUZU MOTOR CO.,(THAILAND) LTD | SAMRONG | ASSY SHOP
PAINT SHOP WBS.PBS |
PALLET FRICTION C/V
SLAT C/V ROOLEE BED |
2012 |
HONDA AUTOMOBILE THAILAND CO.,LTD. | AYUTHAYA | WELD SHOP
(WE2 RECOVERY) |
IVA-FRICTION C/V
OH-FRICTION C/V |
2012
|
TOSHIBA CONSUMER PRODUCTS (THAILAND) CO.,LTD | BANGKADI | REFRIGERATOR
(A,B,C LINE RECOVERY) |
ROLLER C/V
|
2012
|
SUZUKI MOTOR (THAILAND) CO.,LTD | RAYONG | PAINT SHOP | POWER & FREE C/V
IVA-FRICTION C/V
|
2012 |
HONDA VIETNAM CO.,LTD.
|
VIETNAM | ASS’Y SHOP
(NO4 LINE) |
OH C/V
BELT C/V FRICTION C/V SLAT C/V |
2011 |
SHARP APPLIANCES (THAILAND) LIMITED | BANGNA | REFRIGERATOR
(C LINE) |
ROLLER C/V | 2010 |
TOYOTA MOTOR (THAILAND)
CO.,LTD. |
SAMRONG | ASS’Y SHOP | TRIM LINE RENEW SLAT C/V | 2010 |
NISSAN MOTOR (THAILAND)CO.,LTD. | BANGNA | PAINT SHOP | PAINT/FL-13 TOP COAT BOOTH C/V
|
2010 |
Company | Location | Shop & Line | Specification | Year |
---|---|---|---|---|
Inoac Automotive (Thailand) Co., Ltd. | Amata Chonburi |
Paint Shop | Floor C/V | 2009 |
Siamtyre Phra Pradaeng Co.,Ltd. | Samutprakarn | Bandage Line C/V | Power & Free C/V | 2008 |
Honda Vietnam Co.,Ltd. | Vietnam | Ass’Y shop | Oh C/VBelt C/VFriction C/VSlat C/V | 2008 |
Honda Automobile Thailand Co.,Ltd. | Ayutthaya | Weld Shop | IVA Efriction C/VOh Efriction C/V | 2008 |
Toyota Motor Thailand Co.,Ltd. | Banpho | Aass’Y | Cab LineDeck LinePalletAuto EtransferWide Slat C/V | 2006 |
Thai Honda Manufacturing Co.,Ltd | Ladkrabang | Paint | Overhead C/VFloor C/VStorage C/V | 2006 |
Thino Moter Co.,Ltd.. | Amatanakorn | Paint | Cab Frame Ed LineOverhead DenshaFloor C/V | 2005 |
Toyota Motor Thailand Co.,Ltd. | Gateway | Bumper | Overhead Densha 65 UnitDeck Storage | 2005 |
Samrong | Ass’Y | Cab Frame Ed LineOverhead DenshaFloor C/V | ||
Auto Alliance (Thailand) Co.,Ltd. | Eastern | Ass’Y shop | Trim Slat C/VOverhead Densha (11 Hanger : with Hoist)Slat C/V | 2005 |
Mitsubishi Motors (Thailand) Co.,Ltd. | Laemchabang | Ass’Y Shop | Ass’Y ShopDoor Sub P/F (290 pcs.) | 2004 |
Inoac Automotive Thailand | Wellgrow | Paint Shop | Bumper Paint Floor P/F | 2004 |
Isuzu Motor (Thailand) Co.,Ltd. | Samrong | Paint Shop (No.2) | Booth C/VOven C/VStorage C/V | 2004 |
Hino Motor (Thailand) Co.,Ltd. | Samutprakran | Paint Shop | Edoh (17 Unit)Oven C/V (D/L 2 Unit)Storgae C/V Loading C/V | 2004 |
Thai Auto Works Co.,Ltd. | Samrong | Paint Shop | Ed Oh (11 Unit)Oven C/VStorage C/VReturn C/VLoading c/v | 20032004 |
Toyota Motor Thailand Co.,Ltd | Samrong | Ass’Y Shop | Dolly C/V (20 pcs.)Trim Loop (21 Unit)Deck Storage (50 pcs.)Chassis Oh (20 Unit)Chassis Oh (9 Unit)Cab Loop (10 Unit)
Final Oh (7 Unit) Final Oh (10 Unit) |
2004 |
Hitachi Chemical Auto Motive Product (Thailand) Co.,Ltd. | Rayong Siam Eastern Industrial Park | Bumper Paint | Floor P/F C/V | 2003 |
Thai Honda Manufacturing Co.,Ltd. | Ladkrabang | PaintBodyAss’YEngine New Parts Paint | Floor Dolly C/VE.D OhCwbs P/FCarrier 300 pcs.D/L. Auto Transfer 6 Units
Ohc (5 lines) JIG Slat C/V Ohc (3 lines) Ohc Floor C/V |
20022002
2003
|
General Motors Thailand Co.,Ltd. | Rayong Eastern Seaboard | Ass’Y Shop (Pick Eup Truck) | FCS Oh C/V
Carrier 9 Sets EMS Oh C/V Carrier 3 Sets Chassis Slat (1360W) Trim Slat (1360W) Car Final (550W Double) Care Slat Turn Over Equipment 1 Set Frame Loading C/V 1 Set |
2002
2002 |
general motors thailand ltd. | rayongesternseaboard | ass’Y shop (box car)cavity waxcar finalcar finaltrimfinishengine submarriage c/vass’Y shop (pick-up) | oh p&f c/v (carreir20)oh p&f c/v (carrier62)wide slat c/v (1800w)friction c/v (dolly46)slat c/v (400w)free flow c/v (pallet 18)free flow c/v (pallet 32)oh c/vcab carrier 35 setsp Ebox carrier 6 sets | 1999 |
siam nissan summitra co.,ltd | bangpakong | chassis frame paint line | chain c/v | 1997 |
yorozu auto parts co.,ltd. | rayong | paint shop | oh conveyor | 1997 |
t.s tech (thailand) co.,ltd. | ayutthaya | ass’Y shop | oh conveyor | 1996 |
kallawis auto parts co.,ltd. | samrong | paint shop | oh conveyor | 1995 |
thai summit pkk co.,ltd. | laemchabang | ed oven lineempty sdid return line pre & ed coat line |
chain c/vchain c/vdrive roller c/voh motrain | 1996199619961996 |
thai summit pkk co.,ltd. | bangna | paint shoppre & ed coat lineed oven lineempty skid return line | ohc motrainchain c/vchain c/vdrive roller c/v | 1995199519951995 |
honda cars manufacturing(thailand) co.,ltd. | minburiayutthaya | ed ovenbumper | center pusher c/vbumper paint c/v | 19941996 |
thai suzuki motor co.,ltd. | pathumthani | parts paint shop | trolley c/vtrolley c/v | 19931995 |
isuzu motor co., (thailand) ltd. | phrapradaengsamronggateway | paint shop(except pre & ed coat line) body shopass’Y shoptruck ass’Y shoptrim line chassis line |
daccenter pusher c/vdrop lift 1 setslat c/voh motrain (2 loop)skid c/vpretrim c/v oh motrain (3loop)center pusher c/vcenter pusher c/vw-slat c/v |
1992 19961996199620021997199719971997 |
bangchan general assembly co.,ltd. | minburi | paint shop[whole line] | oh motraincenter pusher c/v | 1991 |
siam nissan automobile co.,ltd. | bangplee | paint shop[whole line] new paint shop[whole line] |
oh motraintow c/vcenter pusher c/voh p&f c/vinverted floor c/v | 1991 1993 1996 |
toyota motor thailand co.,ltd. | gate-way | (paint shop)photsphate & ed line (ass’Y shop)trim in lineengine transfer line(resin shop)bumper paint line |
oh p&f c/vlifter 3 setsh motrain 30moh motrainoh motrain inverter floor c/v |
19951995 19951997 1997 |
toyota motor thailand co.,ltd. | samrong | door sub line(weld shop)cab transfer line (ass’Y shop)chassis ass’Y lineengine transfer liner/axle transfer linechassis frame linefinal line |
oh motrainslat c/voh motrainoh motrainoh motrainoh motrainoh motraintable lifte 2 setswide slat c/vroller c/v | 1997199719901994199519971997199719971997 |
hino motors thailand co.,ltd. | samrong-nua | paint shoppretreatment lineed coat lineed & sealer oven line | oh motrainoh motraincenter pusher c/v | 1990 |
mitsubishi motor (thailand) co.,ltd | ladkrabang | paint shop[whole line] | oh motrainchain feedercenter pusher c/v | 1990 |
mitsubishi motors (thailand) co.,ltd. | ladkrabang | paint shopass’Y shop | slat c/vcenter pusher c/vtow c/voh p&f c/voh motrain | 1985 |
experience of nkc Ethai (appliance)
Company | Location | Shop&Line | Specification | Year |
---|---|---|---|---|
Parker Engineering (Thailand) co., ltd | Bangkok | ED PAINT | RENEW OH RAIL | 2024 |
OMH SCIENCE Group Co.,Ltd. | Shenzhen | AS/RS | F&N Dairies Thailand AS/RS Project Installation work | 2022 |
Parker Engineering (Thailand) co., ltd | Bangkok | ED PAINT | ADD EMS CARRIER | 2022 |
OMH SCIENCE Group Co.,Ltd. | Shenzhen | AS/RS | F&N Dairies Thailand AS/RS Project Installation work | 2021 |
Nakanishi Metal Works Co., Ltd. | Osaka | ASSEMBLY | BUMPER FLOOR CV MODIFICATION | 2019 |
Parker Engineering (Thailand) co., ltd | Bangkok | PAINT | OHC CAPACITY UP | 2019 |
Sharp Appliances (Thailand) Limited | Chachoengsao | CABINET PU | RENOVATION CABINET PU C-LINE JIC STORAGE C/V LINE | 2016 |
Kang Yong Electric Public Company Limited | Samut Prakan | DOOR PU | GROUP 24 A NEW DOOR PU CONVEYOR LINE | 2016 |
Daikin Industries (Thailand) LTD. | Chon Buri | ASSEMBLY | NEW CARRY OVERHEAD C/V SYSTEM | 2015 |
Parker Engineering (Thailand) co., ltd | Bangkok | PAINT | NEW PAINT LINE | 2015 |
Taikisha Thailand | Bangkok | PAINT | PAINT SHOP OHC CAPACITY UP | 2014 |
toshiba consumer product ( thailand ) ltd | bangkadinonthaburi | refrigeratordoor – line | door urethane foaming machinenew jig open device (strong up) | 2009 |
daikin industrial thailand co.,ltd. |
chonburi | vacumm line scrap | test station c/v traverser c/v pop-up belt drive c/v |
2008 |
sharp appliances (thailand) ltd | bangpakong | aging c/v line assembly line |
cabinet pu a-line improvement before & after aging cabinet pu a-line modify ( traverser ) ( jig open & close ) table lifter ( hydraulic x – lift ) bridge c/v modify new model mix storage modify |
20092008..20072006 |
toshiba consumer product ( thailand ) ltd. | bangkadinonthaburi | refrigerator c Eline |
top side open device ( cap Epu ) test line c/v |
20072006 |
kang yong electric public company ltd. | bangna Etradkm.20 | refrigerator assembly shop |
vacuum c/v c/v system & testing |
20052004 |
sharp appliances (thailand) ltd. | bangpakong | assembly line | finished good product c/v modify palletizer frame |
2005 |
hitachi consumer products (thailand) ltd. | kabinburi | refrigerator cabinet-pu |
extend cartrack c/v bumper paint c/v cartrack c/v cabinet poly foaming kc-2 cab Epu c/v |
200320022001 |
thai sanei co.,ltd. | bangpakong | mwo body ed , paint |
oh trolly c/v 2 lines | 2001 |
fujitsu general (thailand) ltd | laem chabang | air Econframe ed paint | oh trolly no.1oh trolly no. 2 | 19992001 |
siam okamura co.,ltd. | samrong | frame ed paint | oh trolly c/v 1 line | 2001 |
thai sanei co.,ltd. | bangpakong | mwo bodymd, paint | oh trolly c/v 2 lines | 2001 |
hitachi consumer products(thailand) ltd. | kabinburi | refrigeratorcabinet Epu | cartrac c/v | 2001 |
daikin industsries (thailand) ltd. | bangpakong | assembly shopair conditioner(indoor & out door) | slat c/vdrive roller c/vtow c/voh motrainbelt c/v etc | 1991 |
thai precision mfg co.,ltd. | chonburi | paint shopparts cleaning line | oh trolly c/v | 1992 |
mitsubishi heavy industries-mahajak air conditionersco.,ltd. | ladkrabang | assembly shopair conditioner | slat c/vdrive roller c/voh trolly c/vbelt c/v etc | 1988 |
sharp appliances (thailand) ltd. | bangpakong | assembly linemicrowave oven (4 lines)refrigerator (1 line)fax (4 lines)air conditioner (1 line) | carrierless c/vf. flow c/v door Epu , cab Epudrive foller c/vaccumulation roller c/vslat c/voh trolly c/vbelt c/v etc | 1987 1994 |
(+66) 02-236-3102
[email protected]